New Message Message List Message Management

Name: 董銘偉
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
貴司:
你單位的 “工業循環水系統節能改造專用的管道式水輪機 ”需要的循環水回水壓力能有多大?目前我公司循環水量約6萬噸/天,回水壓力約0.1MPAG,能否應用貴公司的設備,請予以回復!
Message Time:2010-12-22 11:42:06
Answer:

Name: 黃紅星
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
需購1500水輪發電機一臺
Message Time:2010-12-14 21:28:25
Answer:

Name: 黃紅星
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
需購1500水輪發電機一臺
Message Time:2010-12-14 21:27:29
Answer:

Name: 楊帝章
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
楊總:家門,你好!
請教你,在高層建筑中央空調系統進行水力發電改造可否?參數如下,水流量0.64立方/秒,0.83立方/秒,高度43米;管徑D630。水流量0.52立方/秒,高度110米,管徑D630。水流經水輪機后尾水管壓降低多少?本人是從事空調工程業務的,有興趣做你產品在廣東廣西的代理。謝謝!
Message Time:2010-12-08 17:55:08
Answer:

Name: 賈銘
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我公司目前有2臺冷卻循環水塔,共4臺7.5KW電機,4臺3KW電機;希望改造成無動力冷卻水塔,如何改造?請致電!
Message Time:2010-12-08 15:05:39
Answer:

ReturnFirst PagePrevious PageNext Page为什么荒野行动送点券 Page:15/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:[email protected]

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200