New Message Message List Message Management

Name: 岷源公司
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我公司于21日發去傳真,索取電站資料,但一直沒有回應,希盡快回復,謝謝!
Message Time:2005-10-28 10:54:26
Answer:

Name: 王錄興
Tel: Email:
Theme: 水利發電
Design head(m): 12Maximum head(m) : Minimum head(m):
Design flow: 1m3/秒Minimum flow: 0.5m3/秒Meters above sea level(m) : Installed capacity:
Operation in parallel or not: 是Adress: 河南林州
Your Message:
請楊經理告知裝機容量 多少 合適,設備都包括什么,總價多少?
Message Time:2005-10-27 23:22:02
Answer:

Name: 冉景儀
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: 是Adress:
Your Message:
楊經理:
剛才我電話與你聯系了,電站設計水頭104.5米,總引用流量1.64立方米/秒,總裝機2×630,你看選什么機型為好,并把設備配置單、報價用電子郵件發給我,謝謝!
Message Time:2005-10-27 22:44:57
Answer:

Name: 冉景儀
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我公司有電站一座,設計水頭104.5米,引用流量1.64,總裝機1260千瓦,選什么機型為好,能否聯系我們。
Message Time:2005-10-27 22:15:45
Answer:

Name: 潘云林
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我擬訂四臺套500千瓦水輪發電機組,設計水頭6米,總流量40多方,請詢問軸流機組和軸伸貫流機組的臺套價格!大概12月份我們就可定貨!
甘肅臨洮潘家莊水電站
Message Time:2005-10-26 01:28:18
Answer:

ReturnFirst PagePrevious PageNext Page为什么荒野行动送点券 Page:109/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:[email protected]

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200