New Message Message List Message Management

Name: 徐天泉
Tel: Email:
Theme: 詢問小水輪機的價格
Design head(m): 壩高5.5mMaximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: 是Adress: 農村小水電站
Your Message:
我這里是原來建于60年代的小水電站,現在因為沒有人去管已經只有大壩和導水渠\還有原來安裝水輪機的三個水輪坐,大壩高5.5m,導水渠2m寬,水深0.6m流速在每秒一米左右,如果裝機可以裝貴公司的什么型號的機器.可以帶多大的發電機組;請你們幫我參考參考.這全套設備需要多少資金.謝謝幫我發個郵件來.
Message Time:2005-12-17 20:35:25
Answer:

Name: 布愛民
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
回復ST_3 ST_5機型價格及產品介紹
Message Time:2005-12-17 20:31:34
Answer:

Name: 惠真勇
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
請速與我聯系,急求購電站設備
Message Time:2005-12-15 14:49:32
Answer:

Name: 顏向蘭
Tel: Email:
Theme: 詢價及交貨期
Design head(m): 240Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity: 14000kw
Operation in parallel or not: 是Adress:
Your Message:
型號:HLA52-LJ-135
Message Time:2005-12-15 12:16:28
Answer:

Name: 王德琪
Tel: Email:
Theme: 朝鮮朝中水力
Design head(m): 4,2Maximum head(m) : 6,5Minimum head(m): 3
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity: 1000kw
Operation in parallel or not: 未定Adress: 鴨淥江支流朝鮮境內
Your Message:
發電機終端電壓3,3 kv 渦輪式
Message Time:2005-12-14 09:15:20
Answer:

ReturnFirst PagePrevious PageNext Page为什么荒野行动送点券 Page:100/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:[email protected]

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200